Fits Peugeot 207 308 Citroen C3 C4 Catalytic Converter Manifold for Mini R56

With strong economic strength, R & D ternary catalyst based on the technology both inside and outside the essence of a catalyst, using our country’s rare earth resources, precious metals and non-precious metals and other raw materials mainly, and other chemical raw materials as a supplement, we have unique formula of high-tech, science, mature and complete production process with advanced automatic control thermal dedicated tunnel kiln production equipment to match the way the production of a series of three-way catalytic products to ensure that emissions from vehicles to meet the European II , Route, on the 4th standard.


Product Detail

Product Tags

About Us

We also process and manufacture various models of imported cars, special vehicles, such as ternary catalytic converter. Our products are with stable performance, reliable quality, long life and so on. Our products have supported the domestic automobile manufacturers and sold at home and abroad are well received by clients.

Parameters

Carfitment
OE NO. Car Fitment: Mold Year:
18407563247 Mini Cooper 1.6L 1598cc, 1.6L 1598cc N12B16A, 1.6L 1598cc N12B16A, 1.6L 1598cc, 1.6L 1598cc, 1.6L 1598cc, 1.6L 1598cc 2008-2009, 2008, 2007, 2009, 2010, 2011-2013, 2007-2008
         
Product name Mini Cooper
Model Number DJN527
Brand Name DJN
Emission Standard: EURO 2/3/4/5
Material Inside : ceramic(honeycomb) substrate 400cpsi with mat
  Shell :304 or 409 # stainless steel shell,stainless steel pipe
Oxygen sensor ports Yes
cpsi 400 /600/800
Wall thickness 0.09±0.025
Warranty 30000 miles performance/2 years
Packaging: Air bubble film and Carton Packing
MOQ: 50 pcs
Supply Ability 1000 Piece/Pieces per Week
Place of Origin: Jiangsu 
SAMPLE ORDER: Accept 
Condition new 
Function reduce harmful emission (CO,HC,NO) from motor vehicle Over 95% conversion efficiency;
Service Customers' specific demands available, design drawings are welcomed. OEM service is accepted
Supply Ability 1000 Piece/Pieces per Month
Packaging & delivery Air bubble film and Carton Packing, inside fix the product decently with expanded material
Port Shanghai/Ningbo
Lead time: 10-30 days .
Active catalyst ingredients Pt, Pd, Rh, and rare earth elements
Shape round, oval, race track

 

H233a76350fe241db959b94fe019131d7Z.jpg_960x960(1)(1)
H08247f2a6fe34dd08a1cafa8b54d0cffe.jpg_960x960(1)
H51360894e6cf431888e108389b1937214.jpg_960x960(1)
Ha2fa9ff571f94deb986831303f5ce96aJ.jpg_960x960(1)
Hbb2fcfa68b1947df96e9b81f562e206cR.jpg_960x960(1)
H3e95eff1ef1c4f249067ac23971d3364n(1)
H4651496de1024d6887d2d1621350e830A(1)
Hde56fd1d400849adb334291ad7e2ad18Y(1)
H6a5c7424ada84ae8ba249d508529bba2Y(1)
He5ca3ae245574e9c821230def080aac3W(1)
Hdfa280ceee2547729a934f54bacc8bebd(1)
Hfc61eb5ee70d4ff1b564a282c3b07a3dd(1)
Hfffa2c08753d4c8cab18f17c3da2fb31G(1)
5b25b43ffa296e2e64b318ae9e27816
4b7894b44ebdecefa8cadc058750fa7

  • Previous:
  • Next:

  • Write your message here and send it to us